    Lane Field

    Project Details

    Owner/Developer:

    Hines

    Architect(s):

    Pickard Chilton / Kendall Heaton Associates

    Year Built:

    2017

    Height:

    659'

    No. Stories:

    52

    Project Summary:

    The design of a modern Building Maintenance Unit (BMU) is the focal point of the Exterior Building (EBM) System for this tower. A 97' telescoping boom positions a suspended work platform on any point of the buildings facade to provide access for window cleaning and building maintenance. The BMU runs along a structural steel track system that is centrally locations along the building longitudinal axis. The luffing and slewing and elevating mast functions allow the BMU to be stored out of the line of sight.

    Lane Field  San Diego, CA 

    The $84 million, 449,321-SF, 11-story, Lane Field North Hotel consists of a dual-branded Marriott hotel, leased retail area for shops and restaurants, and above-grade structured parking. The dual-branded project consists of a 253-key Springhill Suites select service hotel and a 147-key Residence Inn extended stay hotel.

    Lane Field.jpg